BHIWANDI WAREHOUSE

Project

• Fire Protection System For Warehouse

Area

• 2 Lakh Sq Ft
• 15 Mtr Height

Project Duration:

• 2 Month

PACIFIC ORGANICS PVT LIMITED

Project

• Fire Protection System For Chemical Plant ( Hazardous Gas Group IIC)

Area

• 3 Story Industrial Building
• Hazardous Area

Project Duration:

• 2 Month

IG PETROCHEMICAL LIMITED

Project

•Fire Protection System For Chemical Plant ( Hazardous Gas Group IIC)

Area

• 3 Story Industrial Plant
• Hazardous Area

Project Duration:

• 1 Month

CEAT

Project

•Water / Foam Monitor System

Area

• 3-Story Industrial Plant
• Solar Rooftop
•20 Mtr Height

Project Duration:

•20 Days

GOOGLE WEARHOUSE

Project

• Fire Protection System
(For Wearhouse)

Area

• 29000 sq ft

Project Duration:

• 2 Month

ST. LAWRENCE INTERNATIONAL SCHOOL

Project

• Fire Protection System

Area

• G + 7th Floor Education Building

Project Duration:

• 2 Month

SOLARA ACTIVE PHARMA SCIENCES LTD.

Project

• Fire Protection System
(for Warehouse)
• Rack Sprinkler System

Area

• 5000 sq fit
• Hazardous Storage Area

Project Duration:

• 1 Month

WALAWALKAR HOSPITAL

KAMA OFFICE

      (Kalyan Ambernath Manufacturers Association)

Optimum AMC Services of Fire Fighting Systems